Operational Record

Case Studies

A high-fidelity operational record of Dexler Energy (DEPL) B2B solar parks across Karnataka. Clean power generation, proven returns, and institutional-grade infrastructure.

Dexler Sunrays Solar Park
Operational14.5 MW DC
Gadag, Karnataka

Dexler Sunrays Solar Park

Challenge: Rising DISCOM grid tariffs and high thermal & machining load demand threatening operating margins in Bagewadi industrial belt.

Annual Gen
2,17,50,000
units (21.75 GWh)
CO2 Offset
17,911 tons
2,98,519 trees
Payback
< 4 years
100% Land Owned
Dexler Sun Temple Solar Park
Operational9.1 MW DC
Kalaburagi, Karnataka

Dexler Sun Temple Solar Park

Challenge: Peak milling and heavy casting operations requiring continuous daytime power with zero tolerance for grid voltage dips.

Annual Gen
1,36,50,000
units (13.65 GWh)
CO2 Offset
11,241 tons
1,87,346 trees
Payback
< 4 years
100% Land Owned
Dexler Vistara Solar Park
Operational8.0 MW DC
Chitradurga, Karnataka

Dexler Vistara Solar Park

Challenge: Volatile power costs in Chitradurga renewable corridor impacting yield forecasts for IPP and industrial buyers.

Annual Gen
1,20,00,000
units (12 GWh)
CO2 Offset
9,882 tons
1,64,700 trees
Payback
< 4 years
100% Land Owned
Dexler Sunweave Solar Park
Operational6.0 MW DC
Kalaburagi, Karnataka

Dexler Sunweave Solar Park

Challenge: Textile weaving and garment manufacturing plants facing margin pressure from unpredictable DISCOM tariff hikes.

Annual Gen
90,00,000
units (9 GWh)
CO2 Offset
7,412 tons
1,23,525 trees
Payback
< 4 years
100% Land Owned
Dexler Udaya Solar Park
Operational5.0 MW DC
Raichur, Karnataka

Dexler Udaya Solar Park

Challenge: Food processing and precision manufacturing units experiencing power quality drops during peak production cycles.

Annual Gen
75,00,000
units (7.5 GWh)
CO2 Offset
6,176 tons
1,02,938 trees
Payback
< 4 years
100% Land Owned
Dexler Sunfield Solar Park
Operational3.5 MW DC
Chamarajanagar, Karnataka

Dexler Sunfield Solar Park

Challenge: Clean technology and power ventures seeking bankable, land-backed solar assets in emerging Mysore industrial corridors.

Annual Gen
52,50,000
units (5.25 GWh)
CO2 Offset
4,323 tons
72,056 trees
Payback
< 4 years
100% Land Owned
Dexler Chandra Solar Park
Operational1.55 MW DC
Tumkur, Karnataka

Dexler Chandra Solar Park

Challenge: Specialized healthcare and precision commercial operations requiring uninterrupted, cost-effective green energy.

Annual Gen
23,25,000
units (2.325 GWh)
CO2 Offset
1,915 tons
31,911 trees
Payback
< 4 years
100% Land Owned
Dexler Ojas Solar Park
Opens 15 Dec 2026~8 MWp Planned
Chitradurga, Karnataka

Dexler Ojas Solar Park

Challenge: A new Dexler park in Chitradurga district, planned for institutional buyers seeking land-backed solar plant ownership.

Pipeline Status
Opening Soon - Priority List
View Details →
Dexler Aarohan Solar Park
Opens 15 Jan 2027~7 MWp Planned
Davanagere, Karnataka

Dexler Aarohan Solar Park

Challenge: A new Dexler park in Davanagere district, planned for institutional buyers seeking land-backed solar plant ownership.

Pipeline Status
Opening Soon - Priority List
View Details →
Dexler Aarunya Solar Park
Opens 15 Feb 2027~6 MWp Planned
Chitradurga, Karnataka

Dexler Aarunya Solar Park

Challenge: A new Dexler park in Chitradurga district, planned for institutional buyers seeking land-backed solar plant ownership.

Pipeline Status
Opening Soon - Priority List
View Details →